Carrapateena Tailings Storage Facility Project

Exact Contracting were engaged to construct Stage 1 and 2 of the cross-valley tailings storage facility (TSF) at the Carrapateena copper/gold mine, northeast of Port Augusta, South Australia.

Stage 1 of the TSF consisted of three primary embankment structures – decant dam embankment, TSF embankment and causeway totalling approximately 500,000m³ of imported general fill, select fill (crushed/screened) and clay.

Pipeworks were also completed in conjunction with earthworks including a gravity decant line and multiple seepage collection lines, totalling approximately 4.5km of butt welded pipe and associated fittings/valves.

Stage 2 of the TSF Facility provided a buttress to the existing dam that is sufficient for the proposed total design life.

Scope of works for Stage 2 included:

  • Construction of a 5km haul road from mine waste stockpile to TSF facility.
  • Load and haul of approximately 1,600,000 m3 of waste material to from the mine waste stockpile to the embankment footprint.
  • Screening and installation of armour rock and fine material for the downstream and upstream faces of the embankment.
  • Installation of underground seepage pipe network with extraction sumps.
  • Installation of Bituminous Geomembrane and ballast tubing in the upstream face of the embankment.
  • Installation of precast decant towers.
  • Installation of material over in-situ tailings as a second stage lift to the decant causeway.
Icon
Client
Oz Minerals
Icon
Completed
2019
Icon
Services
Civil, Mining
Icon
Location
South Australia
5km
Total Construction of a haul road
1,600,000m3
Approximate load and haul of waste material
4.5km
Total butt welded pipe and associated fittings