Carrapateena Tailings Storage Facility Project

Exact Contracting were engaged to construct Stage 1 and 2 of the cross-valley tailings storage facility (TSF) at the Carrapateena copper/gold mine, northeast of Port Augusta, South Australia.

Stage 1 of the TSF consisted of three primary embankment structures – decant dam embankment, TSF embankment and causeway totalling approximately 500,000m³ of imported general fill, select fill (crushed/screened) and clay.

Pipeworks were also completed in conjunction with earthworks including a gravity decant line and multiple seepage collection lines, totalling approximately 4.5km of butt welded pipe and associated fittings/valves.

Stage 2 of the TSF Facility provided a buttress to the existing dam that is sufficient for the proposed total design life.

Scope of works for Stage 2 included:

  • Construction of a 5km haul road from mine waste stockpile to TSF facility.
  • Load and haul of approximately 1,600,000 m3 of waste material to from the mine waste stockpile to the embankment footprint.
  • Screening and installation of armour rock and fine material for the downstream and upstream faces of the embankment.
  • Installation of underground seepage pipe network with extraction sumps.
  • Installation of Bituminous Geomembrane and ballast tubing in the upstream face of the embankment.
  • Installation of precast decant towers.
  • Installation of material over in-situ tailings as a second stage lift to the decant causeway.
Icon
Client
Oz Minerals
Icon
Completed
2019
Icon
Services
Civil, Mining
Icon
Location
Northern Territory
Related

Previous projects

Let's chat about your next project.