These works consist of Stage 1 (58km), upgrading existing alignment and sealing between Ch. 271.81km – 330.00km and Stage 2 (91km) design and construct of Ch. 330.00km – 421.00km.
The road construction commenced mobilising in late June 2022. Both stages of the project have now been completed with Exact extremely proud to construct 150kms of high-quality pavement in under three years from contract award.
The project includes:
In an effort to conserve water and improve water efficiency throughout the duration of the works, a strategic water supply network was designed and constructed following geotechnical investigations where additional bores were installed. A series of earthen water storages were been built and connected to a poly pipeline system along the road corridor, allowing the supply of water along the road alignment to be utilised where it was required and, in turn, reducing water haulage, CO2 emissions and facilitating higher productivity through adequate water supply that enabled the use of efficient material mixing techniques.
Other key achievements throughout the project so far include: